You can edit attributes of steps in a Disaster Recovery (DR) plan group to
change the step name, error mode, timeout, and enable or disable the step.
- Navigate to the Resource page for the DR protection
group.
- Click the Plans link in the
Resources panel to list the DR plans for the DR
protection group.
- Click the name of the plan that you want to view.
The plan details with a sequential list of plan groups are
displayed.
- Click the > symbol next to each plan group's name to
expand the group and show the steps in the group.
- Click the 3-dot Action menu for the step for which you want to change the attributes and select Edit to open the Step edit dialog.
- You can change the following attributes in the Step edit dialog:
- Step name – Change the name of the step.
- Error mode – The error mode for step
execution.
- Stop on error mode – Indicates that DR plan execution should stop if step execution fails.
- Continue on error mode –
Indicates that DR plan execution should continue even if the
step execution fails.
- Timeout in seconds – The total duration allowed for the step execution before the step is considered to have timed out. For built-in steps, the timeout value cannot be less than 600 seconds.
- Enable step – Indicates whether the step is enabled for execution. Unchecking the box causes the DR plan execution to skip this step.
- Click Update to close the step edit dialog and save the changes.